U.S. 30 Gateway Bridge inspection calls for timed lane closures
IDOT announced daytime lane controls for the Mississippi River crossing in Whiteside County.
IDOT announced bridge inspection work scheduled for November 16–18 on the U.S. 30 Gateway Bridge over the Mississippi River in Whiteside County, Illinois, weather permitting.
The agency's plan calls for daily lane restrictions from 8 a.m. to 3 p.m., with traffic controlled by flaggers. Completion was anticipated by 3 p.m. November 18; real-time conditions may change.
This is relevant only to vehicles using that crossing. Drivers should consult IDOT's current traveler information and verify route, weight and permit restrictions before setting out.
Primary: Illinois DOT — read original report ↗
These are original editorial summaries, not reproductions of the source article. Check current agency guidance, road conditions and underlying data before acting.
